Production recap
week ending 9/19/97

M & R PRESS

QUANTITY TOTAL

SPOILAGE

% SPOILAGE

GRADE

POINTS

Formula #1

16022

27

0.17

A

100

Formula #2

20000

31

0.16

A

100

Formula #3

14684

102

0.69

D

-50

Formula #4

18935

161

0.85

F

-100

Formula #5

14907

46

0.31

B

50

Formula #6

21747

20

0.09

A

100

Challenger #1

16640

59

0.35

B

50

Challenger #2

13472

18

0.13

A

100

Ultimate

12189

78

0.64

D

-50

Gauntlet #1

156

4

2.56

F

-100

Gauntlet #2

5977

7

0.12

A

100

Gauntlet #3

2540

9

0.35

B

250

SHOP GRADE

157269

562

0.36

 

 

Sample of  production output for 1 week NOT using the
 NEWMAN PIN-LOCK REGISTRATION SYSTEM.
Prior to Pin-Registration: 10-12 changes (per machine, per week, 1 shift)
 9,000 shirts/machine each week
.

The NEWMAN PIN-LOCK REGISTRATION SYSTEM was installed on ALL 12 (older style) machines in approximately 7 days without ANY production interruption.
At the same time, NEW BUFFALO SHIRT FACTORY had just started printing for the
 ROLLING STONES CONCERT TOUR.

After using the NEWMAN PIN-LOCK REGISTRATION SYSTEM
 for 2 weeks (on all 12 machines),
 The following productions numbers were achieved.
10 - 14 Colors

20 to 25 Minute setup times.
 
(previously approx. 1 hour setup time)
13 more jobs per shift per machine.
14 changes per machine, per week, 1 shift.
13,000 average shirts per machine, per week.
$3,000 extra profit per machine weekly.
$20,000 to $25,000 profit per week.

The customer invested $145,000 in the
NEWMAN PIN-LOCK REGISTRATION SYSTEM
for all 12 (older style) machines. (Cost would be less for newer presses).
RETURN ON INVESTMENT (ROI)
The entire system was paid for in 6-7 weeks.

JOB EXAMPLES
(AFTER ONLY 4 WEEKS USING THE SYSTEM)

13 - 14 Color job averaged 10 to 15 minutes with only 2-3 colors needing "slight" micro-registration (just a hair top to bottom or right to left). No "Z" axis (or twists) micro-registration adjustments.

5 Colors: 2-3 minute setup - 720 piece run - 1:44 from burning of screens to boxing of shirts. New Buffalo Shirt Factory received this last minute order at 4:30 PM on Friday afternoon for a Saturday morning delivery to their customer. The entire job was complete and picked up by Fed-Ex at 5:45 PM. The employees were able to go home by 6:30 instead of 8:00 PM